All new building permit applications will be required to have street addresses assigned by Consumers Energy before a building permit

can be issued.

Building permit fees last revised 09-08-98  
   
Building Inspector : Chris Hall (Building Inspector)
   
Septic Tank and Well permits : Environmental Health
209 E. Apple Ave.
Suite C 173
Muskegon MI, 49442
231-724-6208
   
Erosion Control and Soil Sediments permits : Muskegon Public Works
131 E Apple Avenue
Muskegon MI 49442
231.724.6411
   
Driveway permits : Muskegon Road Commission
231-788-2381
Requirements for obtaining a building permit
(Prior to Issuance)

One Family Dwelling
1 - Establish zoning district
a. Front, rear, minimum side-yard and total side-yard requirements
b. Size of structure/minimum floor area requirements
c. Height of structure
d. If new parcel...
1. Proper lot size for zoning district it is in
2. When a land division occurs, approval must be obtained from
Township.
2 - Proof of ownership (copy of deed, etc.)
3 - Parcel number and address of site (Consumers Energy 231-727-6585)
4 - Certificate of survey
5 - Well and septic tank permit (Muskegon county health department)
6 - Driveway permit (Muskegon county road commission)
7 - Engineered truss drawings
8 - Site plan with all setbacks
9 - Set of detailed plans or drawings
a. Front, rear, sides and a sectional drawing
1. Anything over 3,500 sq. feet requires and architect
10 - Michigan energy code worksheet
11 - If not own contractor, must be licensed builder in State of MI
12 - No more than one residence on one parcel
13 - Five day waiting period before issuance of Building permit
14 - No concrete will be poured until a permit is issued

Residential - One and Two family
Calculate a valuation from the residential cost schedule.
Use that valuation with the rate table to determine the fee.

Other

Calculate a valuation from the nonresidential cost schedule. Use that valuation in the rate table to determine the construction fee.
Calculate the plan review fee. - Add the plan review and construction fees together to determine the building permit fee.

Septic Tank And Well Permits
Environmental Health
209 E. Apple Avenue Suite C173
Muskegon, Mi 49442
231-724-6208

Erosion Control & Soil Sediments Permits
Muskegon Public Works
131 E Apple Avenue
Muskegon MI 49442
231.724.6411
Driveway Permits
Muskegon County Road Commission
231-788-2381

Contents copyright 2001 - Spyder Technololgy