There are a number of inspections required in each of the four codes (building, electrical, mechanical and plumbing). Therefore, you must call us when you are ready for each type of inspection. Work must not proceed before the job is inspected and approved to continue. When scheduling the rough-in or final structural inspection, other inspections (plumbing, electrical, mechanical) must be approved and all work must be completed. A final requires finish trim and hardware, finish coverings for walls and floors, railings, address affixed to building, rough landscape, etc. If more than one (1) final inspection is required, additional inspection fees of $25.00 per visit will be charged. Building Inspections Rough-in : When framing is completed, BEFORE drywalling and AFTER electrical, plumbing and mechanical final inspection. Final : When project is complete and ready for occupancy and AFTER electrical, plumbing and mechanical final inspections. Electrical Temporary Service : When
temporary service is complete and ready for hookup. Mechanical Underground : If anything is to be covered by dirt or concrete. Rough-in : If anything is in walls (including ducts or chimneys) before drywalling. Gas Pressure Test : If required Final : When furnace and/or air conditioning is completed and operating and you are ready to occupy. Plumbing Underground : When pipes are all run in ground BEFORE you backfill or pour concrete. Rough-in : When pipes are all run in walls, BEFORE drywalling, also drainage lines in ceiling of basement BEFORE covering. Final : When fixtures are all set and operating and you are ready to occupy. |
||||||||||||||||||
|
||||||||||||||||||